Master Planner (RICHARDSON)
Company: JABIL CIRCUIT, INC
Location: Richardson
Posted on: March 4, 2026
|
|
|
Job Description:
JOB SUMMARY Manage all planning activities for the dedicated
assigned workcell and mentor the Production Planners and Document
Coordinators in the workcell. ESSENTIAL DUTIES AND RESPONSIBILITIES
- Ensure 100% on-time delivery. - Establish build readiness. -
Maintain efficiency of capacity and customer sizing. - Maintain
accurate revenue forecasting. - Maintain material control and
liability. - Develop Master Production Schedule (MPS) and load into
Jabil’s ERP system, including Purchase Order (PO) coverage. -
Reconcile the MPS to customer PO coverage weekly to ensure that
Jabil is not exposed over and above customer PO coverage or other
authorized customer demand. - Ensure the MPS is always 100%
accurate and achievable. - Achieve and maintain 95% MPS goal. - Own
production planning, BOM and document control with or without
additional support. - Analyze material and capacity requirements
and communicate constraints to the Workcell and customer based on
accurate customer demand. - Maintain the workcell’s capacity
planning model; drive resolution on uneven capacity utilization
that keeps Jabil focused on the customer but efficiently utilizing
manufacturing resources. - Meet daily with the Workcell and
manufacturing team to assess production schedules, (adjust as
necessary based on production results) optimize run quantities, and
minimize changeovers to help achieve 100% on time delivery. -
Maintain the customers’ latest contract on file at all times and be
familiar with the terms and conditions of the contract regarding
customer liability of material planning and production scheduling.
This includes the liability window for Jabil material purchase
order placement, purchase price for components, and liability for
any in-house materials (purchased and manufactured). - Be the
workcell’s “expert” on all planning activities by supporting the
Production Planner goal of never starting to build product without
having a valid PO, adequate material quantities, and accurate BOM
and an accurate routing. - Lead the Workcell on the creation of
Bills of Material (BOMs) and routings that allows accurate tracking
of WIP assemblies and accurate inventory movement transactions. -
End-of Life (EOL) management should include chairing a meeting 30
days prior to the last planned build date to create tactics to
support the EOL strategy. The Master Planner would own the build
schedule, corrections and resolution of MPS to customer demand,
planned tactics on deadlines for assemblies out of the various work
areas on the floor, deadline for last shipment, and support plan
for potential RMAs. - Manage Jabil purge process for internal
Workcell purges. - Adhere to all safety and health rules and
regulations associated with this position and as directed by
supervisor. - Comply and follow all procedures within the company
security policy. EDUCATION & EXPERIENCE REQUIREMENTS - Bachelor’s
degree 5 years of experience, or Masters 3 years of related
experience, or PhD without experience. - APICS certification and
Supervisor experience also preferred. - Thorough knowledge of MRP,
lead times for specific component types, internal run rates, test
development lead times, machine programming lead times and complete
understanding of the chronological sequence of events that must
occur in order to build a product. - Or an equivalent combination
of education, training, or experience.
Keywords: JABIL CIRCUIT, INC, Grand Prairie , Master Planner (RICHARDSON), Logistics, Transportation & Drivers , Richardson, Texas